Permission to draw groundwater, and everything after it

The Central Ground Water Authority regulates groundwater abstraction under the Environment (Protection) Act. If your unit draws groundwater for industrial use, the No Objection Certificate is not optional, and in recent years the obligation has shifted from a one-time permission to an ongoing reporting duty.

Filing has moved to the Bhuneer portal

Applications and renewals now run through Bhuneer, which replaced the older NOCAP system. It is more document-intensive: the hydrogeological position, the abstraction figure, the proposed conservation measures and the evidence behind each are all examined rather than declared.

What we prepare

  • Applicability review - whether the NOC is required, and under which category, from your actual abstraction figure.
  • Hydrogeological documentation and the supporting technical report the application rests on.
  • Portal filing on Bhuneer, and response to queries raised during scrutiny.
  • Water conservation and recharge proposals, including rainwater harvesting where the site allows it.
  • Post-grant compliance - telemetry conditions, abstraction data upload and the annual water quality testing through our accredited laboratory.
  • Renewal, started inside the ninety-day window rather than after the expiry date has passed.

The expensive mistake is the calendar

A lapsed NOC does not pause abstraction - it makes it unauthorised. Every litre drawn after expiry can attract environmental compensation for the entire lapsed period, and that liability survives the renewal being granted later.

The second recurring problem is the telemetry condition. Meters get installed and then stop reporting, and the gap in the data is visible to the Authority long before anyone at the plant notices it.

Groundwater sits alongside your consent conditions and your water balance - the three are read together during an inspection, so they should agree with each other.

Frequently Asked Questions

Do we need a CGWA NOC at all?

If you abstract groundwater for industrial, infrastructure or mining use, generally yes. Micro and small enterprises drawing under about 10 cubic metres a day are usually outside the requirement. The safe answer comes from your actual abstraction figure and the category your unit falls in, not from the size of the borewell.

What is the Bhuneer portal?

It is the filing system the Central Ground Water Authority moved to, replacing the older NOCAP platform. Fresh applications and renewals both run through it, and it asks for more documentation and more compliance evidence than the system it replaced.

When should renewal be started?

At least ninety days before the existing NOC expires. If the certificate lapses, abstraction after that date is unauthorised, and environmental compensation can be levied for the whole lapsed period even if the renewal is eventually granted.

What conditions follow once the NOC is granted?

Typically a tamper-proof digital flow meter with telemetry on every abstraction structure, periodic upload of abstraction data, and annual groundwater quality testing through an accredited laboratory. The conditions written into your own NOC govern - these are the ones that recur.

Can you handle the water testing as well as the paperwork?

Yes. The quality testing that the NOC conditions call for runs through our own laboratory capability, so the sampling, the analysis and the submission stay inside one accountable process.

Related reading

industries

Industries We Serve

Serving a wide range of industries with reliable environmental, safety, and engineering solutions tailored to regulatory and operational needs.

Petrochemical

Oil & Gas

Chemical

Pharmaceutical

Refineries

Power Plants

Building & Construction

Mines & Washeries

Fertilizers

Automotive

Manufacturing

Engineering & Heavy Industries

process

What is Our Process?

Understanding client requirements - first stage of our consulting process

Understanding Requirements

We begin by analyzing client needs, project scope, and regulatory obligations to ensure clarity from the start.

Planning and scoping stage of our environmental consulting process

Site Assessment & Planning

Our experts conduct detailed assessments and create practical, compliant plans tailored to the project requirements.

Execution and compliance stage of our environmental consulting process

Execution & Compliance

We implement solutions efficiently while ensuring adherence to environmental, safety, and statutory regulations.

Review and ongoing support stage of our environmental consulting process

Review & Ongoing Support

We monitor outcomes, provide documentation, and offer continuous support to maintain long-term compliance and performance.

As per MOEF & CC’s (Govt. of India) Office Memorandum F. No. 22-34/2018-IA.III dated 9th August 2018 Self-Environmental Audit shall be conducted annually. Every three years third party environmental Audit shall be carried out.
As per MOEF & CC’s (Govt. of India) Office Memorandum F. No. 22-34/2018-IA.III dated 9th August 2018 Self-Environmental Audit shall be conducted annually. Every three years third party environmental Audit shall be carried out.
Ask For Quote